The promised 4-6 weeks following release for 12.1 looks like:

8th July (4)
15th July (5)
22nd July (6)

The first of them would combine with a very stretched 11.8; SRM might
prefer to get 11.8 done earlier and leave more time for 12.1 to mature.

Thanks,
--
Jonathan Wiltshire ***@debian.org
Debian Developer http://people.debian.org/~jmw

4096R: 0xD3524C51 / 0A55 B7C5 1223 3942 86EC 74C3 5394 479D D352 4C51
ed25519/0x196418AAEB74C8A1: CA619D65A72A7BADFC96D280196418AAEB74C8A1
Cyril Brulebois
2023-06-19 21:20:01 UTC
Permalink
Hi,
Post by Jonathan Wiltshire
8th July (4)
15th July (5)
22nd July (6)
The first of them would combine with a very stretched 11.8; SRM might
prefer to get 11.8 done earlier and leave more time for 12.1 to mature.
I can push the d-i buttons for any dates; I think I'd rather avoid
having to do debian-cd bits if others are available (it'd be a chance
to finalize my streamlining work, but the past few months have been
absolutely exhausting; I'd like to take a breather, or ten).


Cheers,
--
Cyril Brulebois (***@debian.org) <https://debamax.com/>
D-I release manager -- Release team member -- Freelance Consultant
Donald Norwood
2023-06-19 23:00:02 UTC
Permalink
Hi
Post by Jonathan Wiltshire
Hi,
8th July (4)
15th July (5)
22nd July (6)
If the 8th is doable Press can do it and the 15th, would prefer the 15th or
22nd.
--



Be well,

-Donald
--
-
⢀⣎⠟⠻⢶⣊⠀
⣟⠁⢠⠒⠀⣿⡁ Donald Norwood
⢿⡄⠘⠷⠚⠋⠀ B7A1 5F45 5B28 7F38 4174
⠈⠳⣄⠀⠀⠀⠀ D5E9 E5EC 4AC9 BD62 7B05
Mark Hymers
2023-06-20 12:20:01 UTC
Permalink
On Mon, 19, Jun, 2023 at 10:04:06PM +0100, Jonathan Wiltshire spoke thus..
Post by Jonathan Wiltshire
Hi,
8th July (4)
15th July (5)
22nd July (6)
The first of them would combine with a very stretched 11.8; SRM might
prefer to get 11.8 done earlier and leave more time for 12.1 to mature.
I can't do the 15th, so someone else from ftp would have to do it. The
other two currently look ok.

Mark
--
Mark Hymers <mhy at debian dot org>
Steve McIntyre
2023-06-20 12:40:01 UTC
Permalink
Post by Jonathan Wiltshire
Hi,
8th July (4)
15th July (5)
22nd July (6)
The first of them would combine with a very stretched 11.8; SRM might
prefer to get 11.8 done earlier and leave more time for 12.1 to mature.
All of those work for me.
--
Steve McIntyre, Cambridge, UK. ***@einval.com
"I used to be the first kid on the block wanting a cranial implant,
now I want to be the first with a cranial firewall. " -- Charlie Stross
Adam D. Barratt
2023-06-20 17:10:02 UTC
Permalink
Post by Jonathan Wiltshire
8th July (4)
15th July (5)
22nd July (6)
Any of those should work for me. I'd prefer one of the latter two.
Post by Jonathan Wiltshire
The first of them would combine with a very stretched 11.8; SRM might
prefer to get 11.8 done earlier and leave more time for 12.1 to mature.
That's not entirely accurate, but I'll expand in the 11.8 thread.

Regards,

Adam
Luna Jernberg
2023-06-26 12:00:01 UTC
Permalink
Can help the 8th July if help is needed, can't help the other dates
however as i will be busy with vacation and GUADEC then
Post by Jonathan Wiltshire
Hi,
8th July (4)
15th July (5)
22nd July (6)
The first of them would combine with a very stretched 11.8; SRM might
prefer to get 11.8 done earlier and leave more time for 12.1 to mature.
Thanks,
--
Debian Developer http://people.debian.org/~jmw
4096R: 0xD3524C51 / 0A55 B7C5 1223 3942 86EC 74C3 5394 479D D352 4C51
ed25519/0x196418AAEB74C8A1: CA619D65A72A7BADFC96D280196418AAEB74C8A1
Jonathan Wiltshire
2023-06-28 07:20:02 UTC
Permalink
Post by Jonathan Wiltshire
8th July (4)
15th July (5)
22nd July (6)
We'll go for 12.1 only on 22nd July, announcements to follow.
--
Jonathan Wiltshire ***@debian.org
Debian Developer http://people.debian.org/~jmw

4096R: 0xD3524C51 / 0A55 B7C5 1223 3942 86EC 74C3 5394 479D D352 4C51
ed25519/0x196418AAEB74C8A1: CA619D65A72A7BADFC96D280196418AAEB74C8A1
Andy
2023-06-28 11:20:01 UTC
Permalink
Post by Jonathan Wiltshire
Post by Jonathan Wiltshire
8th July (4)
15th July (5)
22nd July (6)
We'll go for 12.1 only on 22nd July, announcements to follow.
Ack. I'm available
/Andy
Luna Jernberg
2023-06-28 12:50:01 UTC
Permalink
Should be able to help the 22th July too
Post by Andy
Post by Jonathan Wiltshire
Post by Jonathan Wiltshire
8th July (4)
15th July (5)
22nd July (6)
We'll go for 12.1 only on 22nd July, announcements to follow.